Restoring 120 acres of critical wildlife habitat after wildfire damage. This project includes erosion control, native plant restoration, and trail rehabilitation.

Project Goals

  • Erosion control and slope stabilization
  • Native plant restoration with drought-resistant species
  • Trail rehabilitation for public access
  • Wildlife habitat enhancement

Progress

We have completed 75% of the restoration work, including major erosion control measures and the planting of over 5,000 native trees and shrubs. The trail system is being rehabilitated with sustainable design practices.

The Veterans Monument, an Eagle Scout project by Liam Gavigan, was dedicated at Arrowhead Ridge in 2016. The site now serves as both a conservation showcase and a place for community gathering and reflection.